City Of Bozeman
Home MenuDesign a Stormwater Post-Construction Facility
Post-Construction Facility Requirements
All new and redevelopment projects that meet the regulatory threshold (5000 sq. ft.) or more of developed area are required to manage site runoff using a post-construction facility. The City of Bozeman Design and Construction Standards – Oct. 2024, contain specific siting and sizing requirements.
Post-Construction Facility Design Guidance
Montana Post-Construction Stormwater BMP Design Guidance Manual - This cities of Montana prepared this manual to assist planning and engineering professionals with selecting, designing, constructing, and maintaining post-construction stormwater facilities. The information presented in the manual is the result of extensive research and the combined expertise of stormwater professionals in Montana and throughout the United States. Please contact the Stormwater Division with questions.
Example Projects
Date Completed: 2019
Location: East Mason Street and South Tracy Avenue.
Description: Boulevard infiltration gallery
Date Completed: 2017
Location: East Valley Center and Catamount
Description: Borgert DrenaPaveTM permeable pavers and bioretention swale
Date Completed: October 2017
Location: City Hall
Description: Pave DrainTM permeable pavers and drought tolerant landscaping.
Date Completed: Summer 2016
Location: Cannery District Development
Description: Parking lot island bioretention swale