During the summer months, our division is particularly busy with multiple necessary tasks.
The contractor demands pick up and we are performing a large number of water service inspections to ensure proper installation. Several big projects and a lot of small projects have kept the department busy with contractors alone.
The summer months are the best time to excavate. We use this time catch up on some of the work that would have been impossible to do in the winter or otherwise costly and difficult. We repair and replace fire hydrants, dig problematic water valves, and typically fix quite a few curb stops or curb boxes.
Because of the action, our utility locating needs have also increased. We keep breaking records for total locate requests received and it keeps our division busy marking utilities.
The major project in effect this summer is the widening of Durston from Sheridan to N 7th. Contractors will be replacing a bit of the water and sewer infrastructure during this time along with the road upgrade. Please be patient and courteous when travelling through the effected areas.
Below are pictures of a curb box (fig 1) and fire hydrant (fig 2) being replaced.
Figure 1

Figure 2

If you have any questions or concerns please call the city shops at 582-3200.