Water Treatment Plant Division

The Water Treatment Plant provides the citizens of Bozeman with a safe and dependable drinking water supply.  The City of Bozeman has been supplying water to city residents since 1889.  

The city's source water comes from Lyman Creek in the Bridger Mountains, and from Sourdough, and Hyalite creeks in the Gallatin mountains. In the Hyalite creek drainage the city has 5400 acre feet of water storage in the Middle Creek reservoir, this comprises about half of the stored water from that source.     

Water from the Sourdough and Hyalite drainages is treated at the Sourdough Water Treatment Plant.  The Sourdough Water Treatment Plant was constructed as a ten million gallon a day plant in 1984, an additional five million gallons of capacity was added in 1993.  At the Sourdough plant, raw water is filtered through an anthracite and sand filter media.  The water is then chlorinated, and fluoridated, and chemically adjusted to make it less corrosive. The Sourdough Water Treatment Plant delivers about 75% of the water requirement for the City; it is located at the mouth of Sourdough Canyon, South of Bozeman.        

The water from the Lyman Creek source is ground water; it is chlorinated, fluoridated and then introduced to the distribution system.  Production from the Lyman spring varies through the year, peaking in early summer at 1.5 million gallons a day.       

There are three finished water storage tanks providing, when full, eleven million gallons of storage.        

For quality assurance, Water Treatment Plant division employees conduct a rigorous water quality sample and testing schedule at the plants, and in the distribution system.  Water Plant employees also are responsible for the care, and maintenance of the three finished water storage tanks.


The Water Treatment Plant may be reached through the City Shop Complex telephone 582-3200.


Water Quality Report
      

      View Water Quality Report 2007 

    2005 Water Production:    1,813,776,045 gallons
     Distribution System Water Quality Samples Taken per year: 3000+
     Employees: nine certified Water Treatment Plant operators

 

Watershed
        Sourdough drainage                33 square miles
        Hyalite drainage                      51 square miles
        Lyman Spring recharge area   13 square miles

 


Links

Xeriscape

Cheyenne Board of Public Utilities Water Conservation Page

Montana Water Course

American Water Works Association Consumer Water Center

Montana Water Center 

New Test Page
 

 
 
 

Disclaimer Copyright© 2006 City of Bozeman Privacy Statement   login

Site Powered By Revize
Page Counters