Greater Bozeman Area Transportation Plan 2001 Update
Zipped archive of entire document for download
COVER
TABLE OF CONTENTS AND ACKNOWLEDGEMENTS
Executive Summary
|
CHAPTER 1: INTRODUCTION AND BACKGROUND |
Page | ||
|
|
1.1 |
Project Background |
1-1 |
|
|
1.2 |
Study Area |
1-1 |
|
|
Study Area Boundary |
1-2 | |
|
|
1.3 |
Transportation Planning Goals |
1-3 |
|
|
1.4 |
Previous Transportation Planning Efforts. |
1-4 |
|
|
1.5 |
Public Involvement |
1-4 |
|
CHAPTER 2: EXISTING CONDITIONS |
| ||
|
|
2.1 |
Existing Road System |
2-1 |
|
|
2.2 |
Existing Traffic Volumes |
2-1 |
|
|
1998 Annual Average Daily Traffic - ADT (Study Area) |
2-2 | |
|
|
1998 ADT Map Bozeman Area |
2-3 | |
|
|
2.3 |
Existing Signal System |
2-6 |
|
|
2.4 |
Intersection Level of Service |
2-6 |
|
|
Existing Signalized Intersections (Bozeman Area) |
2-7 | |
|
|
Existing Signalized Intersections LOS Analysis (A.M. and P.M.) |
2-9 | |
|
|
2.5 |
Travel Speed |
2-10 |
|
|
Travel Speed (Bozeman Area) |
2-11 | |
|
|
Running Speed and Delay (Bozeman Area) |
2-12 | |
|
|
2.6 |
Truck Traffic |
2-13 |
|
|
2.7 |
Pavement Survey |
2-14 |
|
|
2.8 |
Street Lighting |
2-14 |
|
|
Pavement Survey (Bozeman Area) |
2-15 | |
|
|
Corridor Lighting (Bozeman Area) |
2-16 | |
|
CHAPTER 3: TRAVEL DEMAND FORECASTING |
| ||
|
|
3.1 |
Traffic Model Development |
3-1 |
|
|
3.2 |
Socioeconomic Trends |
3-2 |
|
|
3.3 |
Population and Employment Projections |
3-4 |
|
|
3.4 |
Allocation of Growth within the Study Area |
3-5 |
|
|
Gallatin County Population Trends and Projections 1970-2020 |
3-6 | |
|
|
Gallatin County Employment Trends and Projections Full and Part Time Employment 1970-2020 |
3-6 | |
|
|
3.5 |
Committed Transportation Improvements |
3-7 |
|
|
3.6 |
Traffic Volume Projections |
3-8 |
|
|
3.7 |
Network Alternatives Test Run Analysis |
3-8 |
|
|
2010 Average Daily Traffic-ADT (Study Area) |
3-9 | |
|
|
2010 Average Daily Traffic-ADT (Bozeman Area) |
3-10 | |
|
|
2020 Average Daily Traffic-ADT (Study Area) |
3-11 | |
|
|
2020 Average Daily Traffic-ADT (Bozeman Area) |
3-12 | |
|
CHAPTER 4: PROBLEM IDENTIFICATION |
| ||
|
|
4.1 |
Corridor Volumes and Capacity |
4-1 |
|
|
4.2 |
Intersection Level of Service |
4-3 |
|
|
Identified Transportation Problems |
4-5 | |
|
|
4.3 |
Accident Analysis |
4-6 |
|
|
4.4 |
Transit System |
4-9 |
|
|
4.5 |
Pedestrian and Bicycle System |
4-9 |
|
|
4.6 |
Downtown Bozeman |
4-10 |
|
|
4.7 |
Traffic Calming |
4-10 |
|
CHAPTER 5: TRANSPORTATION DEMAND MANAGEMENT |
| ||
|
|
5.1 |
Role of TDM in the Plan Update |
5-1 |
|
|
5.2 |
List of TDM Strategies and Their Effectiveness |
5-1 |
|
|
5.3 |
Conclusions Based on Preliminary TDM Evaluation for Bozeman |
5-4 |
|
|
5.4 |
Recommended TDM Program |
5-6 |
|
CHAPTER 6: PEDESTRIAN AND BICYCLE ANALYSIS |
| ||
|
|
6.1 |
Introduction |
|

