Notices
BOARD OF APPEALS MEMBER NEEDED:
The
Citizen Advisory Board of Appeals was established to determine the suitability
of alternate materials and methods of construction and to provide reasonable
interpretation of the following codes of the City: Building, Electrical,
Mechanical and Plumbing.
This Board is currently seeking a citizen to volunteer to be a member of this
board.
If interested, an application can be found at
Advisory Board Current Positions
to the right of the Board of Appeals listing or by contacting the citizen
advisory board’s coordinator at 406-582-2320 or
akissel@bozeman.net
Updates
Article regarding condominiums and townhouses has been updated.
Click Here
Building Permit valuation chart has been updated. Please use the new chart posted under brochures and handouts or Click Here
DEMOLITION PERMITS FOR FOUNDATIONS
Effective October 20, 2008 - When a House is being lifted off its foundation to dig a basement or to repair
the foundation, a “Demolition Permit” will be required. Please apply to the
Building Department for the Demolition Permit.
ELECTRICAL, ROOF, PLUMBING, MECHNICAL, and SUB-CONTRACTORS:
ATTENTION CONTRACTORS
Please bring your bid sheets to the Building Department when you are picking up
permits so that we can verify the job address, the scope of work, and the
correct valuation. Thank you.
Storm Damaged Roof Requirements:
Attention ROOFERS:
-
Permits are required;
-
Underlayment required (per IRC R905.1)
-
Flashing/Drip edge required (per IRC R905.2.8)
-
Ice Barrier required from roof eave to a point of at least 24" inside the exterior wall of the building (per IRC R905.2.7.1)
plan review fees
Plan Review Fees are due and payable when submitting an application and plans
for a building permit.
Plan Permits Expire in 180 Days
Please be reminded that approved plan permits expire 180 days after approval for issue. If you don't pick up your plans within that 180 days or request an extension, the plans will be discarded and removed from the systems. If you don't pick up the plans within the 180 day period and do request an extension the impact fees will be re-assessed by the Planning Department to reflect any changes in the impact fees currently in effect.
Download Monthly Reports
The monthly reports may be downloaded from this web site, may be picked up at the
office or provide a stamped self-addressed envelope for copies by mail.